FGP-WPMP

Tengizchevroil's (TCO) Future Growth Project-Wellhead Pressure Management Project (FGP-WPMP) is the next major expansion of the Tengiz oilfield. Through FGP-WPMP, TCO continues to make a major contribution to the Republic of Kazakhstan's economic progress, helping to create a legacy of a trained and skilled local workforce, technology transfer through partnerships with international companies, and upgraded infrastructure in the region.

pdf FGP-WPMP

FGP-WPMP-icon

Kazakhstani goods & services spent in 2024

Number of Kazakhstani citizens employed

Crude production
increase by

kazakhstani-citizens-employed

FGP-WPMP is built of modules fabricated in Kazakhstan, South Korea and Italy and transported to the Tengiz oilfield for final assembly.

The FGP-WPMP modules, many of which weighed between 500 to 1800 tonnes each were transported through the Russian Inland Waterway System (RIWS) and into the Caspian Sea. The total weight of marine cargo transported was almost 280,000 metric tonnes.

Read more
FGP-WPMP

Local, Kazakhstani registered companies, such as Ersai and KCOI with operations in Mangystau Oblast, proved their capabilities by manufacturing 75 large pre-assembled pipe-racks and 10 remote instrument enclosures according to international standards. The marine work scope involved the operation of more than 126 vessels, of which 40 were newly constructed vessels or significantly modified to support the project. Meanwhile, KazMorTransFlot operated module carrying vessels in the Caspian Sea. In total, the vessels travelled over 140,000 km between Kazakhstan and other international locations. One of the main legacies of the project is that a new Cargo Transportation Route (CaTRo), was specially built at Prorva near Tengiz, and included a 71 km marine access channel, cargo offloading and storage facilities and a haul road to the Tengiz field where modules are being assembled according to plan.

projects-process1projects-process2

Since the commencement of FGP-WPMP, TCO has spent over $13.6 billion to purchase Kazakhstani goods and services. Approximately 91 percent of the total project workforce are Kazakhstani citizens. TCO has engaged Kazakhstani entities to participate in FGP-WPMP in engineering, procurement and fabrication services, has pre-screened 2,351 Kazakhstani companies and awarded 1,250 parent contracts to almost 600 to Kazakhstani registered companies.

projects-process3

On November 4th, 2021, FGP-WPMP has safely achieved early oil production from a new metering station. The new metering station is the third of four metering stations, which are connected to their respective clusters of wells, as part of the oil gathering system being built for FGP-WPMP. The 3 existing metering station clusters are already producing over 13 000 tonnes per day or 100,000 barrels crude oil per day of incremental early oil production, which is aimed at keeping existing plants full, alongside improving the ultimate recovery of resources. New full-time positions for the national workforce of Kazakhstan have been created through this latest development.

projects-process4projects-process5

June 3, 2022, at Tengiz was launched an Integrated Operations Control Center (IOCC). This state-of-the art IOCC facility applies the latest digital technologies and is the only facility of its kind in Kazakhstan's oil and gas industry. It will integrate the management of all TCO's production plants into one control center and operating model.

The IOCC is located 20 km away from TCO's production facilities. It also includes a 2200 square meter central control room which is designed to provide Tengiz field operators with the flexibility to make better decisions, improve reliability and optimize production performance. Over 30 Kazakhstani companies and more than 600 employees, contributed to the construction and commissioning of this world class facility. By working on the commissioning of the IOCC the local workforce has also improved their knowledge and skills through comprehensive training and being part of this unique experience.

Protocols

All Protocols

2018

Protocol of the FGP-WPMP Consultation Meeting held in Zhana Karaton - 9 October 2018

2018

Protocol of the FGP-WPMP Consultation Meeting held in Turgyzba - 9 October 2018

2018

Protocol of the FGP-WPMP Consultation Meeting held in Shokpartogai - 10 October 2018

FGP-WPMP Project Stories